1. What are the different kinds of IC (Integrated Circuit) and their functions?
Pre-test
1. B
2. B
3. A
4. C
VII. Self – Evaluation.
The data relating to the Connection Point and the User Development that are submitted by a User applying for a Connection Agreement or an Amended Connection Agreement shall be registered in three (3) stages and classified accordingly as:
(a) Preliminary Project Planning Data;
(b) Committed Project Planning Data; and
(c) Connected Project Planning Data;
Supervisory Control and Data Acquisition (SCADA). A system of remote control and telemetry used to monitor and control a power System.
Purpose
(a) To cite the legal and regulatory framework for the promulgation and enforcement of the Philippine Grid Code;
(b) To specify the general rules pertaining to data and notices that apply to all Chapters of the Grid Code;
(c) To specify the rules for interpreting the provisions of the Grid Code; and
(d) To define the common and significant terms and abbreviations used in the Grid Code.
Scope
(a) The Grid Owner;
(b) The System Operator;
(c) The Market Operator;
(d) Generators;
(e) Distributors;
(f) Suppliers;
(g) Any other entity with a User System connected to the Grid
Post-test
1. A
2. A
3. D
4. B
5. D
6. A
7.A