1. What are the different kinds of IC (Integrated Circuit) and their functions?

Pre-test

1. B

2. B

3. A

4. C

VII. Self – Evaluation.

  1. What is the stage of Data Registration?

The data relating to the Connection Point and the User Development that are submitted by a User applying for a Connection Agreement or an Amended Connection Agreement shall be registered in three (3) stages and classified accordingly as:

(a) Preliminary Project Planning Data;

(b) Committed Project Planning Data; and

(c) Connected Project Planning Data;

  1. 1.What is the requirements for Electrical Diagram?
  1. 2.What is SCADA?

Supervisory Control and Data Acquisition (SCADA). A system of remote control and telemetry used to monitor and control a power System.

  1. What are the scope and purpose of the grid Code

Purpose 

(a) To cite the legal and regulatory framework for the promulgation and enforcement of the Philippine Grid Code;

 (b) To specify the general rules pertaining to data and notices that apply to all Chapters of the Grid Code; 

(c) To specify the rules for interpreting the provisions of the Grid Code; and 

(d) To define the common and significant terms and abbreviations used in the Grid Code.

Scope

(a) The Grid Owner; 

(b) The System Operator; 

(c) The Market Operator; 

(d) Generators;

 (e) Distributors; 

(f) Suppliers; 

(g) Any other entity with a User System connected to the Grid

Post-test

1. A

2. A

3. D

4. B

5. D

6. A

7.A